Log Entries - July 2004

DateChapterDescriptionHours
Thu 1 24 Glassed one side of front and rear thigh supports and rear seat backs. 2
Fri 2 24 Trimmed all the seat parts. Cut the foam every 1". 2
Sat 3 24 Mounted front and rear thigh support bulkheads to table. Glued thigh supports in place for glassing. 3
Sun 4 24 Cut glass for seats. Glassed thigh supports and rear seat back. Cut foam for rear heat duct cover and landing brake cover. 6
Mon 5 24 Trimmed all the seats and seat bulkheads. Floxed front and rear seat braces into place. 3
Tue 6 24 Cut all the BID tapes and peel ply for the seat bulkheads. 1
Wed 7 16 Taped rudder conduit on left side of fuselage. 1
Wed 7 24 Drilled holes for left side armrest - filled with flox. Taped and peel plied all the seat bulkheads. 4
Thu 8 24 Sanded bulkhead tapes. Started cutting back seat hinges. 1
Mon 12 24 Cut hinges and hinge pins for seat backs. Drilled rivet holes. 1
Sun 18 17 Made CZRT-1. Test fit CZRTH and all hardware. 1
Sun 18 24 Prepared foam and glass for covers. 1
Mon 19 24 Glassed 1 BID for inside foam of landing brake and heat duct covers. 1
Tue 20 24 Cut out all the cover parts. 1
Monthly Total 28