Log Entries - January 2004

DateChapterDescriptionHours
Thu 1 19 Continued carving foam in wing ribs. 1
Fri 2 19 Finished shaping wing root foam. Cut out left aileron. 3
Sat 3 19 Removed, sanded, and shaped all the foam in the left wing trailing edge aileron cutout. 1
Thu 8 19 Prepared for wing trailing edge spar layup. 1
Mon 12 19 Glassed trailing edge spar for left aileron. 3
Thu 15 19 Trimmed last layup. Made mount for wing root bearing. Cut glass and prepared foam for inboard wing rib layup. 3
Fri 16 19 Added inboard rib layup and LWA7. 3
Sun 18 13 Attached tubing and fittings for pitot system. Cut rest of foam to fit into nose. Began shaping foam piece to seal airflow under F-5. 3
Sun 18 19 Sanded inboard rib layup. Prepared for outboard rib layup. 2
Tue 20 19 Glassed outboard rib and attach point reinforcements. Microed steel rod to left aileron. 2
Monthly Total 22