Log Entries - Chapter 24

DateChapterDescriptionHours
Sun 3/21/04 24 Made mold for map pockets. Taped onto table, setup glass. Cut, shaped, and fit foam for right front arm rest. 5
Mon 3/22/04 24 Began cutting foam for right rear armrests. 1
Sun 3/28/04 24 Cut foam for most of right rear armrest. 2
Mon 3/29/04 24 Finished cutting pieces for right rear armrest. 1
Tue 3/30/04 24 5-minute epoxied all the pieces for the right side armrests. 2
Sun 4/4/04 24 Glassed inside of right armrests. Glassed map pockets. 2
Mon 4/5/04 24 Trimmed front right armrest to fit in place. Cut and trimmed map pockets. Cut armrest to fit map pocket. 2
Tue 4/6/04 24 Trimmed rear right armrest. Made transition block for front right armrest. 2
Sat 5/1/04 24 Final prep work to glass armrests. Put tape in place on fuselage. Trimmed map pocket. Glued front transition piece. 2
Sun 5/2/04 24 Glassed right rear armrest. Cut glass for front right armrest. 3
Thu 5/6/04 24 Removed and trimmed the right rear armrest. 1
Fri 5/7/04 24 Glassed right front armrest. 2
Thu 5/13/04 24 Trimmed front right armrest. Drilled holes for both right side armrest - filled with flox. 1
Sat 5/15/04 24 Cut all foam for front left armrest. Glued pieces with 5-minute. Made transition piece. 6
Sun 5/16/04 24 Cut and assembled all foam for left rear armrest. 5
Mon 5/24/04 24 Glassed inside of both left side armrests. 3
Thu 5/27/04 24 Trimmed and sanded last layup. Sanded outside of armrests. 1
Sat 5/29/04 24 Glassed outside of left rear armrest. Attached left map pocket and electrical conduit. Cut left armrest for map pocket. 6
Sun 5/30/04 24 Glassed left front armrest. Floxed left rear electrical conduit into place. Trimmed left rear armrest. Cut out front and rear seat supports. 7
Sun 6/6/04 24 Removed and trimmed front left armrest. Glassed one side of front and rear seat braces. 3
Tue 6/15/04 24 Trimmed last layup. Cut glass and added 1 BID to other side of all thigh support braces. 2
Sat 6/19/04 24 Trimmed all the thigh support bulkheads. Cut foam for front and rear thigh supports. 5
Tue 6/22/04 24 Cut all glass and peel ply for next layup - thigh supports and seat backs. 1
Thu 7/1/04 24 Glassed one side of front and rear thigh supports and rear seat backs. 2
Fri 7/2/04 24 Trimmed all the seat parts. Cut the foam every 1". 2
Sat 7/3/04 24 Mounted front and rear thigh support bulkheads to table. Glued thigh supports in place for glassing. 3
Sun 7/4/04 24 Cut glass for seats. Glassed thigh supports and rear seat back. Cut foam for rear heat duct cover and landing brake cover. 6
Mon 7/5/04 24 Trimmed all the seats and seat bulkheads. Floxed front and rear seat braces into place. 3
Tue 7/6/04 24 Cut all the BID tapes and peel ply for the seat bulkheads. 1
Wed 7/7/04 24 Drilled holes for left side armrest - filled with flox. Taped and peel plied all the seat bulkheads. 4
Thu 7/8/04 24 Sanded bulkhead tapes. Started cutting back seat hinges. 1
Mon 7/12/04 24 Cut hinges and hinge pins for seat backs. Drilled rivet holes. 1
Sun 7/18/04 24 Prepared foam and glass for covers. 1
Mon 7/19/04 24 Glassed 1 BID for inside foam of landing brake and heat duct covers. 1
Tue 7/20/04 24 Cut out all the cover parts. 1
Fri 4/29/05 24 Floxed landing brake cover parts together. Trimming heat duct cover parts to size. 2
Sun 5/1/05 24 Floxed together pieces of the aft heating duct cover. 2
Fri 5/6/05 24 Sanded heat duct cover to shape and prepared for glassing. Cut glass for heat duct cover and landing brake cover. 1
Sun 5/8/05 24 Glassed rear heating duct cover. Glassed landing brake cover. 4
Mon 5/9/05 24 Trimmed heating duct cover and landing brake cover. 1
Fri 5/20/05 24 Added BID tapes to landing brake cover while in place in the fuselage. 1
Mon 9/11/06 24 Cutting and fitting canard cover foam. 1
Thu 9/14/06 24 Began shaping of canard cover. 1
Fri 9/15/06 24 More sanding of canard cover. 1
Sat 9/16/06 24 Finished shaping canard cover. 1
Chapter Total 106